National 12
Sidebar
 

N1289 Crester progress

Started by 2 Old Gits, 09 Feb 2022, 10:00

« previous - next »

2 Old Gits

The hull has been repaired by gluing and dowling, sanded back to wood on the outside and had a first coat of 8 intended coats of varnish that will be polished.  All the fittings have been stripped.  It really is apparent that it is a mast the same size as a Wayfarer attached to a floating tea tray. Two of us picked it up easily.  We are already speculating on how it will perform against a modern boat and I have suggested a trapeze (my sense of humour).  We would like to return it to its original form but getting contemporary fittings means replacing the broken ones like the one shown and, more difficult, identifying those that are missing before we can source them.

2 Old Gits

Pictures of the preparation work in restoration.  I think we have already decided this is a work of love and demonstration of what we can do, not a money making venture given the time it is taking.  We want it back to original condition with a WOW factor.